精中文字幕无码日韩欧毛_最新日韩欧美不卡_丰满少妇一级毛片亚卅曰韩电影_午夜96视频在线_国产一级黄a大片_高清综合三级无码_亚洲综合夜夜久久久_欧美成人高清在线_av手机版天堂中文字幕_美女内射毛片在线看免费人动物

Sitemap| feedback| Facebook| Youtube| China

新一代高端智能通道閘名優(yōu)品牌

service hotline
Email:info@zoje-tech.com 86-133 168 44018
Knowledge of Turnstile Gate

Recommended Products

contact us

National Hotline:4009-969-805

HongKong ZOJE Intelligent Technology Co,.Ltd
telephone:0086-13316844018
fax:0086-755-28766066
Phone:86-133 168 44018  Mr.Ben
email:info@zoje-tech.com
address:3rd Floor,Building C,JinAo Industrial Park, GuanLan Town,Longhua District,ShenZhen,China

Parking barrier system maintenance rules

Article Source:PoweredPopularity:2437issuing time:2016-01-07 16:21:45SmallInLarge

Why to regulate intelligent car parks Daozha system maintenance program? Intelligent car parks Daozha system how to use longer? Here are car parks Daozha system manufacturers in the Czech Republic Zhian to collate all maintenance rules, to ensure the appearance of good car parks Daozha, opening and closing operation is flexible and reliable, extend the service life of the brake system.

(一). Scope of application
Applicable to the property group under the jurisdiction of each post property parking barrier maintenance work.

(二).the use of Party duties
1, the system technical personnel responsible for the implementation of the work of the maintenance of the road according to this regulation.
2, the system engineer is responsible for the implementation and supervision of the organization and maintenance work.
3, the total quality management office is responsible for the maintenance of the inspection, supervision.

(三). parking barrier maintenance rules
Maintenance content:
1, car dressing rod, on or off the reflective membrane degumming repair.
2, take off the top cover of the gear box, open the door of the gear box, and add lubricating oil to the rotating shaft.
3, add the gear box oil.
4, a comprehensive fastening wire connector, filing electrical contacts.
5, check the capacitor when there is deterioration of oil spills, immediately replaced.
6, check the box door, box cover sealed to prevent the rain from entering.
7, open the gear box, check the gear wear and limit switch fastening.
8, wipe the dust of the parts in the box.
Maintenance period:
The maintenance technician should be according to the frequency of maintenance parking barrier system:
1, stop dressing bar, check monthly maintenance time.
2, to add lubricating oil to the rotation axis, check and maintenance once a month.
3, add the gear box oil, check and maintenance once a month.
4, fastening wire connector, electrical contacts, filing, check monthly maintenance time.
5, check the capacitor, check and maintenance once a month.
6, check the box door, the box cover seal, check and maintain once a month.
7, check the gear wear and limit switch fastening, once every six months.
8, wipe the dust in the parts of the box, check and maintenance once a month.
在線客服系統(tǒng)
live chat